Preston Station Gallery

Photos from 2000 to the present day


Last additions - 2017
IMG_3992a.jpg
D9009 Alycidon leads the Pathfinder Tours TRANS PENINE DELTIC LAMENT through Leyland. 242 viewsThe tour from York to Liverpool was tailed by 68031.
Photo : Kenneth Dickinson 30-Dec-2017
Dec 30, 2017
IMG_4000a.jpg
68031 brings up the rear of the Pathfinder Tours TRANS PENINE DELTIC LAMENT through Leyland. 239 viewsThe tour from York to Liverpool hauled by D9009 ALYCIDON .
Photo : Kenneth Dickinson 30-Dec-2017
Dec 30, 2017
Salwick_station_251217_5_SPPP.JPG
A plant machine manoeuvres onto the tracks at Salwick on Christmas day morning. The signal box has been demolished during December and masts appear to be in place along most of the line between Preston and Kirkham.248 viewsPhoto : Mark Bartlett 25-Dec-2017Dec 27, 2017
Kirkham_station_251217_2.JPG
Kirkham station on Christmas Day 2017. There is a lot of work to do before the Blackpool South line reopens on 28th January 2018 but the new third platform is taking shape.255 viewsPhoto : Mark Bartlett 25-Dec-2017Dec 27, 2017
Kirkham_Nth_Jn_east_view_251217_1.JPG
Looking east from Kirkham North Junction towards the station on 25.12.17, showing the new Civil Engineers siding that has been provided during the rebuild. The crossover that will allow trains from Blackpool South to access the new Up Platform is just vis261 viewsPhoto : Mark Bartlett 25-Dec-2017Dec 27, 2017
Kirkham_Nth_Jn_251217_2_SPPP.JPG
The view west at Kirkham North Junction on Christmas Day. The pile of red bricks on the right is all that is left of the signal box. The track layout here has been simplified for electrification.266 viewsPhoto : Mark Bartlett 25-Dec-2017Dec 27, 2017
Poulton_LF_091217_1_1024.JPG
Refurbishment work at Poulton-le-Fylde on 9th December 2017. 286 viewsAlthough the station is closed until March 2018 the tracks have to be kept clear as engineering trains continue to pass through going to and from Blackpool North. The semaphore signals and box were still in place on this day but can’t last much longer.
Photo: Mark Bartlett 09-Dec-2017
Dec 15, 2017
Blackpool_North_091217_7_1024.JPG
Newly laid tracks at the approach to Blackpool North, alongside the depot sidings. The lorry on the left was carrying new track panels, which were being taken into the station area by a railway crane.310 viewsPhoto: Mark Bartlett 09-Dec-2017Dec 15, 2017

01 January 2017


DSC_1702_1024.jpg

10 files, last one added on Jan 29, 2017
Album viewed 269 times

02 February 2017



0 files
Album viewed 0 times

03 March 2017


DSC_1710_1024.jpg

7 files, last one added on Mar 25, 2017
Album viewed 223 times

04 April 2017


IMG_3624a_1024.jpg

4 files, last one added on Apr 27, 2017
Album viewed 205 times

05 May 2017


88002_68025_S_C_Pioneer_1024.jpg

6 files, last one added on May 23, 2017
Album viewed 195 times

06 June 2017


Woodacre_68026_68004_Crewe_Sellafield_300617_1024.JPG

3 files, last one added on Jul 02, 2017
Album viewed 165 times

07 July 2017


Darkinson_Lane_142036_MVI_BPN_200717_1024.JPG

8 files, last one added on Jul 21, 2017
Album viewed 177 times

08 August 2017


40145_Preston_170817_N63A4133-a_1024.jpg

4 files, last one added on Aug 17, 2017
Album viewed 176 times

09 September 2017


IMG_7962_1024.JPG

6 files, last one added on Oct 03, 2017
Album viewed 170 times

10 October 2017


50049_50007_Preston_071017_N63A5225-a_1024.jpg

4 files, last one added on Oct 08, 2017
Album viewed 176 times

11 November 2017


Carleton_Crossing_box_demolition_211117_5_1024~0.JPG

7 files, last one added on Nov 22, 2017
Album viewed 198 times

12 December 2017


IMG_3992a.jpg

10 files, last one added on Dec 30, 2017
Album viewed 157 times

12 albums on 1 page(s)

Random files - 2017
Maudlands_Bridge_160117_7_1024.JPG
Clearance of vegetation has been taking place on the land around Maudlands Bridge and the Miley Tunnel - possibly for use by UCLAN ?293 viewsPhoto : Mark Bartlett 16-Jan-2017
66547_Salwick_280117_1024.JPG
66547 standing on the Down Line to the east of Salwick station with an engineering train on 280117. The Preston skyline can be seen beyond the train.260 viewsPhoto : Mark Bartlett 28-Jan-2017
66610_Salwick_280117_2_1024.JPG
66610 waits by Salwick signal box while an engineering train is loaded with spoil during the weekend closure of the Blackpool line for electrification work 280117.313 viewsPhoto : Mark Bartlett 28-Jan-2017
Woodacre_68026_68004_Crewe_Sellafield_300617_1024.JPG
The Class 68s are starting to dominate on flask movements. Nearly new DRS 68026, and sister loco 68004 ‘Rapid’, work from Crewe to Sellafield at Woodacre152 viewsPhoto : Mark Bartlett 30-Jun-2017
IMG_3785_1024.JPG
(5M50) 35018 BRITISH INDIA LINE approaching Lostock Hall Station 15.53hrs on 6th July 2017, on a loaded test run. The engine was displaying 98818 on the cab sides.244 viewsPhoto : 06-Jul-2017 Kenneth Dickinson
Tornado_Preston_2017-09-16_1024.jpg
60163 Tornado pulls into platform 6 at Preston before taking-on water for its onward trip north198 viewsPhoto : Peter Parnell 2017-09-20
Poulton_LF_091217_1_1024.JPG
Refurbishment work at Poulton-le-Fylde on 9th December 2017. 286 viewsAlthough the station is closed until March 2018 the tracks have to be kept clear as engineering trains continue to pass through going to and from Blackpool North. The semaphore signals and box were still in place on this day but can’t last much longer.
Photo: Mark Bartlett 09-Dec-2017
Salwick_station_251217_5_SPPP.JPG
A plant machine manoeuvres onto the tracks at Salwick on Christmas day morning. The signal box has been demolished during December and masts appear to be in place along most of the line between Preston and Kirkham.248 viewsPhoto : Mark Bartlett 25-Dec-2017