 Most viewed - 2018
|

A Class 319 EMU leaves Kirkham on the first day of electric services to Blackpool North. The lift towers on both platforms are nearing completion.1057 viewsPhoto : Mark Bartlett 20-May-2018
|
|

The view from Harrowside Bridge towards Blackpool Pleasure Beach on 9th January 2018 during the Blackpool South line closure. 913 viewsHarrowside is being rebuilt and has been closed to road vehicles but pedestrians can still cross.
Photo : Mark Bartlett 09-Jan-2018
|
|

Seen from the east end of the original island platform, a train for Preston pulls away from Kirkham’s new Platform 3. 724 viewsStation refurbishment continues and the wires and masts still need to be installed before the Easter reopening to Blackpool North.
Photo : Mark Bartlett 30-Jan-2018
|
|

The new footbridge at Kirkham is now available for passengers to access Platform 3 but the lifts have not yet been installed. 722 viewsA Blackpool South service can be seen through the arch.
Photo : Mark Bartlett 30-Jan-2018
|
|

Under the wires, 142047 slows to call at Salwick with a Blackpool South to Preston Service.702 viewsThe equipment on the platform is a repeater, for the benefit of train guards, showing if the colour light beyond the bridge is ‘On’ or ‘Off’ before they give the ‘right away’ signal.
Photo : Mark Bartlett 07-Mar-2018
|
|

SR Merchant Navy Class 4-6-2 35018 BRITISH INDIA LINE (5M50) as it approached Lostock Hall Station on a test-run round the usual Carnforth circuit.597 viewsPhoto : Kenneth Dickinson 07-Mar-2018
|
|

45690 LEANDER and 45407, running as 45157 THE GLASGOW HIGHLANDER, (5Z66) from Bury East Lancs Railway to Carnforth. 557 viewsWith an unusual coupling, engine 2 support coaches engine.
Photo : Kenneth Dickinson 12-Mar-2018
|
|

45699 GALATEA heading the Carnforth - Sheffield (1Z45) "Pennine Limited" with WCRC class 47, 47 772 CARNFORTH TMD on the rear.547 viewsPhoto : Kenneth Dickinson 03-Mar-2018
|
|

45699 GALATEA heading the Carnforth - Sheffield (1Z45) "Pennine Limited" with WCRC class 47, 47 772 CARNFORTH TMD on the rear.541 viewsPhoto : Kenneth Dickinson 03-Mar-2018
|
|

Large gantries are now being installed at Blackpool North.535 viewsThe platforms are also being finished but it looks like shots of the tower from the station will be a thing of the past.
Photo : Mark Bartlett 02-Mar-2018
|
|

Poulton No.3 was the only one of the Blackpool line signal boxes to survive into 2018. 524 viewsSeen here on 9th January, with catenary masts being erected all around although some await the box’s demolition before installation.
Photo : Mark Bartlett 09-Jan-2018
|
|

New valances being installed on the L&YR canopy at Poulton-le-Fylde.521 viewsThe old valances were much deeper and the shorter ones are needed to provide adequate clearance for electrification. The line reopens for diesel services on 26th March 2018. Electric services begin with the start of the May 2018 timetable.
Photo : Mark Bartlett 02-Mar-2018
|
|
|
|