Preston Station Gallery

Photos from 2000 to the present day


Most viewed - 2018
BPN_390152_1554_SO_BPN_EUS_319386_BPN_PRE_070718_2.JPG
Pendolino 390152 waits in Platform 1 at Blackpool North520 viewsprior to forming the 1554hrs (SO) to Euston, while a Class 319 EMU departs Platform 2 for Preston.
Photo : Mark Bartlett 07-Jul-2018
Poulton_020318_3.JPG
New valances being installed on the L&YR canopy at Poulton-le-Fylde.519 viewsThe old valances were much deeper and the shorter ones are needed to provide adequate clearance for electrification. The line reopens for diesel services on 26th March 2018. Electric services begin with the start of the May 2018 timetable.
Photo : Mark Bartlett 02-Mar-2018
Carleton_Crossing_020318_1.JPG
All masts and Catenary wires now in place at Carleton Crossing.506 viewsPhoto : Mark Bartlett 02-Mar-2018
IMG_4156.JPG
45690 LEANDER and 45407, running as 45157 THE GLASGOW HIGHLANDER, (5Z66) from Bury East Lancs Railway to Carnforth. 490 viewsWith an unusual coupling, engine 2 support coaches engine.
Photo : Kenneth Dickinson 12-Mar-2018
Forton_68017_2C32_CAR_PRE.JPG
After much ‘Will they / won’t they?’ the Class 68s took over one Cumbrian Coast diagram from 12th March 2018.483 views68017 brings up the rear of 2C32 Carlisle to Preston at Forton with 68018 providing the southbound haulage for the three coaches.
Photo : Mark Bartlett 12-Mar-2018
Woodacre_90016_90046_Coatbridge_Daventry_060218.JPG
Freightliner 90016 and 90046, in falling snow, cross the Grizedale Beck at Woodacre with the Coatbridge to Daventry intermodal service.473 viewsPhoto : Mark Bartlett 06-Feb-2018
IMG_4218.JPG
1Z78 THE SALOPIAN EXPRESS 1, with 35018 BRITISH INDIA LINE and WCRC Class 47 47 760 on the rear.470 viewsPhoto : Ken Dickinson 21-Mar-2018
Poulton_LF_100218_3.JPG
View westwards from Poulton station overbridge on 10th February 2018. The signal box clings on for the time being. Under the bridge in the distance a spoil train, headed by 66413, can be seen – one of several lined up between here and Layton on this day468 viewsThe signal box clings on for the time being. Under the bridge in the distance a spoil train, headed by 66413, can be seen – one of several lined up between here and Layton on this day
Photo : Mark Batlett 10-Feb-2018
Poulton_LF_100218_6.JPG
A view over Poulton station on 10th February 2018 as work continues towards the Easter reopening461 viewsPhoto : Mark Batlett 10-Feb-2018
8_BPB_south_090118_2.JPG
View south from Blackpool Pleasure Beach station on 9th January 2018. 458 viewsIn the distance Harrowside Bridge is being rebuilt during the closure period as is the bridge at Squires Gate station.
Photo : Mark Bartlett 09-Jan-2018
3_Weeton_view_SE_090118_1.JPG
Weeton, from the over bridge, looking towards Kirkham on 9th January 2018. All masts in place on this section but no wires yet.454 viewsPhoto : Mark Bartlett 09-Jan-2018
1_Weeton_box_site_090118.JPG
The site of long demolished Weeton signal box, with masts now in place on the line below.446 viewsPhoto : Mark Bartlett 09-Jan-2018
89 files on 8 page(s) 2