All change on the Blackpool line...323 viewsPoulton No.3 L&YR signal box, seen on its last evening of operation, 10th November 2017 prior to the Preston to Blackpool lines closing for electrification.
Photo : Mark Bartlett 11-Nov-2017 (2 votes)
Electrification work in progress at the Blackpool carriage sidings.322 views (1 votes)
All change on the Blackpool line...315 viewsCarleton Crossing Box, name board already removed, during its last evening shift – 10th November 2017. The 16 lever LNWR box opened in 1924.
Photo : Mark Bartlett 11-Nov-2017 (1 votes)
All change on the Blackpool line...330 viewsBlackpool North No.2 L&YR signal box during its final evening of operation, 10th November 2017. In the foreground new track has been laid, but not yet connected, for the new Platform 1.
Photo : Mark Bartlett 11-Nov-2017 (1 votes)